Skip to main content

CONTI+ CNX 2.0 Initial CONO400000

CNX 2.0 initial system installation

Initial installation and building-specific parameterisation of the new CONTI+ CNX 2.0 water management system in accordance with the CONTI+ standard, taking into account the following settings:

• Network settings
• System and location naming, including contact details
• Creation of new user accounts
• Blocking times for thermal flushing
• System backup
• Import/export of existing parameters and settings

The initial installation also includes the following configurations:
• Structuring of the system into areas and zones
• Creation of action groups for flushes (thermal flush, hygiene flush, cold water flush)
• Creation of action groups for maintenance stop functions

System check on an operational system:
• Test run of a hygiene flush
• Test run of a thermal flush

In addition to travel costs – costs correspond to the rates for customer service work.

Want to see
more products?

 

Back to overview

Learn more about
our References

 

References

Do you have Questions?
Contact us

 

Contact