CONTI+ CNX 2.0 Initial CONO400000
CNX 2.0 initial system installation
Initial installation and building-specific parameterisation of the new CONTI+ CNX 2.0 water management system in accordance with the CONTI+ standard, taking into account the following settings:
• Network settings
• System and location naming, including contact details
• Creation of new user accounts
• Blocking times for thermal flushing
• System backup
• Import/export of existing parameters and settings
The initial installation also includes the following configurations:
• Structuring of the system into areas and zones
• Creation of action groups for flushes (thermal flush, hygiene flush, cold water flush)
• Creation of action groups for maintenance stop functions
System check on an operational system:
• Test run of a hygiene flush
• Test run of a thermal flush
In addition to travel costs – costs correspond to the rates for customer service work.

